Ankom TDF Dietary Manuale Utente Pagina 91

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 96
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 90
Operator’s Manual
Rev E 12/2/14 pg. 91
2. Open the pump doors.
2.1 Unscrew the six acorn nuts on the
back of the instrument and remove
the clear back panel to access the
pump area.
2.2 Un-latch the two pump doors so
they are open.
2.3 Reinstall the clear back panel and
tighten the acorn nuts.
When returning the instrument to service after a period of non-use, you must close
and latch the pump doors and charge all of the lines before running. See the
IDF/SDF Analysis, TDF Analysis, or Diagnostics sections of this manual for
information about charging the lines.
Acorn Nuts (the top two are behind the black torsion bar)
Cable Tie
Pump Doors
Vedere la pagina 90
1 2 ... 86 87 88 89 90 91 92 93 94 95 96

Commenti su questo manuale

Nessun commento